[1]
Pérez Albán, C.A. et al. 2016. Design and implementation of a control system to improve the quality of the combustion gases in the fire-tube boiler of 5 BHP. Enfoque UTE. 7, 2 (Jun. 2016), pp. 55 – 68. DOI:https://doi.org/10.29019/enfoqueute.v7n2.95.