Alternative Under Frequency Load Disconnection Methodology Based on Semi-Adaptative Model


Abstract

Stability analysis in electrical power systems is based on the study, in dynamic state, of the voltage and frequency, because when there is some contingency it fluctuates drastically due to the primary and secondary controls of the voltage and frequency to the power systems that act on the generators. In order to solve the possible stability problems that may arise in power systems, various techniques have been developed that act on the generating machines for their protection, as well as on the loads for the power cut. The present resarch proposes an alternative methodology for load disconnection by low frequency as an option to save the power system from a possible blackout due to instability caused by a fall in the frequency, managing to improve the results affected by other improved techniques, the frequency change range, frequency deviation and the effects of demand disconnection. The proposed methodology was tested in the IEEE 14 bus system.

Resumen

El análisis de la estabilidad en los sistemas eléctricos de potencia se fundamenta en el estudio en estado dinámico del voltaje y frecuencia, ya que cuando se presenta alguna contingencia, estos fluctúan drásticamente debido a los controles primarios y secundarios de tensión y frecuencia de los sistemas de potencia que actúan sobre los generadores. Para solventar los posibles problemas de estabilidad que se pueden presentar en los sistemas de potencia, se han desarrollado diversas técnicas que actúan sobre las máquinas generadoras para su protección como sobre las cargas para el corte de energía. La presente investigación plantea una metodología alternativa para la desconexión de carga por baja frecuencia como opción para salvar al sistema de potencia de un posible colapso por inestabilidad por caída de la frecuencia, logrando mejorar los resultados expuestos por otras técnicas, mejorando el rango de cambio de frecuencia, la desviación de frecuencia y los efectos de la desconexión de la demanda. La metodología propuesta se la probó en el sistema de 14 buses del IEEE.


1. Introduction

The different elements that make up the electrical power systems (EPS), such as power plants, electrical substations, transmission lines, compensation systems and distribution systems are made of with many control elements and automated processes that act directly on the preservation of the steady state operation of the power system; despite this, events that are difficult to predict and that happen outside the power system that may affect the stability and normal operation of the system may occur (Kundur, 1994; Massucco & Delfino, 2001).

The analysis of which elements affect directly the loss of stability, both in frequency and voltage, implies that in the generation, transmission and distribution stages alternative processes are generated to restore the normal operating ranges of the power system; however, there is a risk that the system will exceed the stability limits and the generation will be insufficient to compensate for the different electrical parameters, causing a general blackout of the system. One of the solutions proposed is the increase of generation plants based on non-conventional renewable energies; but with this option, uncertainty conditions have been introduced to the power grid due to the random nature of the methodological variables (Arias, Vargas & Rahmann., 2015; Carrión, González, Isaac & López, 2017; Guerrón, García & Montero, 2014; Mazaher & Hazlie, 2014; Schmitz & Smith, 2009; Short, Infield & Freris, 2007).

Different methodologies have been proposed in the scientific literature to save power systems from possible blackouts. The most important of which includes the correct planning of EPS expansion, optimal location of compensators and, as a last resort, load disconnection schemes (Kundur, 1994; Kupzog, 2008; Massucco & Delfino, 2001). The disconnection of cargo not only affects the operation of the SEP but also generates annoyance in the end users and in many of the occasions it affects industrial loads or medical services. Thus, when there is a large number of residential users fed by the substation primary as the last strategy to improve or compensate for stability problems, the load disconnection is carried out (Águila, Carrión & Ortiz, 2015; Carrión, González, Isaac, López, & Cardona, 2017; Shokooh et al., 2005).

Traditional EPS have become a smart grid, which are based on communication, control, monitoring and energy management systems to optimize the use of resources and the response to contingencies. The operation control algorithms of the SEP are found in the control centers, where the behavior of all the electrical variables of the EPS is monitored and decisions are made to connect or disconnect elements for events such as low system frequency (Carrión & Gonzalez, 2018; Carrión & González, 2019; Correa, Inga, Inga, & Hincapie, 2018; Inga Ortega, Inga, Correa, & Hincapié, 2018; Maldonado, 2017; Ruiz, Masache, & Domínguez, 2018; Ruiz Maldonado & Inga, 2019).

On the other hand, when you have isolated systems you have many elements whose behavior is random and stochastic, which can be harmful to the network. There is also the disadvantage of the lack of rolling stock due to its limited capacity to expand the system, which is, somehow, to be solved with renewable generation. With the limitation of the generation, there is a poor response to demand demands, which influences load disconnection events (Carrión & Ortiz, 2013; Shafiullah, Alsharif, Hossain & Ahsan, 2014).

Many authors have dedicated themselves to studying blackouts and methodologies of low frequency load disconnection (UFLS); for example in Carrión, Ayo & González, 2019; Laghari et al., 2012; Liu & Thomas, 2011; Perumal & Ying, 2004; Ten & Crossley, 2008; and Tofis, Hadjidemetriou & Kyriakides, 2013, phenomena related to instability in large islands, effects of generation output, impact of renewable generation and different types of contingencies are studied; that is why in that EPS type the presence of the slightest disturbance significantly affects the behavior of the network in voltage, current and power; affecting the reliability and stability of the system.

For the different current protection elements the rule is used for every 1 % frequency decline 2 % of the total load is necessary to disconnect (Anderson, Fouad & Happ, 1979; Massucco & Delfino, 2001; Systems, Committee, Power & Society, 2007).

This research focuses on the development of a new methodology for low frequency load disconnection based on the Semi-Adaptive model, in which changes in the comparative parameters of optimum power to be disconnected are proposed, with restrictions on the deviation of Dynamic frequency of the EPS; as a test system IEEE 14 bus scheme is used.

Onwards, the article is organized as follows: Section II describes the different load disconnection techniques and their influence on the frequency, as well as the times of action they present; in section III, the problem formulation is described; in section IV the state of an electrical system before and after implementing the proposed scheme, as well as its effects on the network, is presented. Finally, the conclusions of the work are offered in section V.

2. Load disconnection scheme

In electrical systems, the power in generation terminals can be directly controlled by the primary and secondary regulation of voltage and frequency, demand response models, system frequency response systems and the rolling stock. In case of the existence of any contingency, the EPS controllers analyze the frequency limits so that the generators change their operating conditions and, in case of not being sufficient, to carry out other alternatives such as the disconnection of load from the system.

The first step to load disconnection processes is to analyze Rate of Change of Frequency (ROCOF), based on the information of the frequency provided by the monitoring system, especially with the critical frequency values ​​that are below the operating limit that cause the system to shut down. The disconnection of the system by low frequency (f) is carried out in a sectorized way, disconnecting loads consecutively until the EPS frequency is within the operating limits. this results in the proportionality of the disconnection that relates the frequency change (∆f) and the amount of disconnected load (∆LS). All the aforementioned processes can also be done through simulations to generate a route map of the disconnection scheme.

A second process is to apply the semi-adaptive method that quantifies the change of frequency in small intervals of time (df/dt), with which the frequency is measured constantly and depending on the amount of disconnected load the speed is determined which ones exceed the frequency limits.

The third method used is the adaptive disconnection model, which considers the change in power (∆P) caused by the drop-in frequency that directly affects the inertia of the generating machines. This effect has a response in time as indicated in (1), which is related to the disconnection scheme shown in (2), which quantifies the portion selected for relief. The adaptive method is adjusted to the contingency present in the EPS, estimated from the least representative value that helps to obtain the LS.

(1)

(2)

The frequency protection relays are based on ROCOF for their action against events in the EPS and the basis of the algorithm is the analysis of the zero crossing and the Fourier transform. In reference to the response time and to avoid false activations, the response time of the relay is between 50 and 500 ms, which increases the reliability of the device.

The measurement window is determined by the number of frequency periods over which the frequency change will be calculated; usually up to 100 cycles are considered. Possible interlocks due to low voltage should be considered, which may block the action of the frequency relay. Such consideration is beneficial when starting up generators or short circuits in the EPS.

The structure of a frequency relay with ROCOF is shown in Figure 1 (Ten & Crossley, 2008). There are a lot of procedures and criteria that should be considered to design the load disconnection process that includes:

• Maximum overload advance

• Number of load disconnection steps

• Load disconnection size at each step

• Frequency adjustment

• Time delays

• Location of frequency relays

Figure 1

ROCOF relay structure and interaction with low frequency calculation

1390-6542-enfoqueute-11-01-00096-gf1.jpg

3. Problem formulation

Frequency relays that use ROCOF as the activation method start the process assuming a generation-load imbalance. Immediately after the separation of islands occurs, a power imbalance is generated, which can cause a dynamic change of frequency, and, by neglecting the action of the machine controller, the equation (3) can be approximated (Massucco & Delfino, 2001; Ten & Crossley, 2008).

(3)

Where the variables P_G and P_L correspond to the power of the generator and the power of the load that will vary depending on the instability, as H corresponds to the constant of inertia. Likewise, in the calculation of the static ROCOF algorithm, the inertia parameters are calculated using (4) initial time (5), disconnection time (6), disconnection frequency (7), overload after disconnection (8), df/dt after disconnection (9) (Zin, Hafiz & Wong, 2004):

(4)

(5)

(6)

(7)

(8)

(9)

The scheme shown in Figure 2 shows the procedure mentioned by performing the LS in disconnection percentages determined at set values ​​of frequency limits. Thus, in Figure 3, the established method allows us to modify the previous process by minimizing the ΔPf, with which the variation of one min (df/dt) is reduced by helping to increase the final frequency of restoration, improving the stability process.

Figure 2

Conventional LS flowchart

1390-6542-enfoqueute-11-01-00096-gf2.jpg

Figure 3:

Improved LS flowchart minimizing system df / dt

1390-6542-enfoqueute-11-01-00096-gf3.jpg

4. Results analysis

To test the proposed methodology, the IEEE 14 bus test model is used, as can be seen in Figure 4, with thermal generation units. Table 1 shows the data of the generation units, Table 2 shows the data of the power system reactance and Table 3 shows the demand information.

Figure 4

IEEE 14 bus system

1390-6542-enfoqueute-11-01-00096-gf4.png

1390-6542-enfoqueute-11-01-00096-gt1.jpg

Table 2

Reactance of transmission lines.

1390-6542-enfoqueute-11-01-00096-gt2.jpg

Table 3

Demand assigned

1390-6542-enfoqueute-11-01-00096-gt3.jpg

Considering that the slack bus is 8, studies are made on the generator connected and the frequency relays with 100 % overload are analyzed, and its response when applying a conventional disconnection scheme can be seen in Table 4. Table 5 shows the EPS response when applying the proposed load disconnection methodology. When applying the alternative methodology for low frequency load disconnection based on the semi-adaptive model, the EPS is more stable and the frequency change is closer to the nominal values of the system.

Table 4

Respuesta de UFLS convencional

1390-6542-enfoqueute-11-01-00096-gt4.jpg

Table 5

Respuesta de UFLS alternativa

1390-6542-enfoqueute-11-01-00096-gt5.jpg

Figure 5:

Frequency behavior in the system

1390-6542-enfoqueute-11-01-00096-gf5.png1390-6542-enfoqueute-11-01-00096-gf5.png

In contrast, Figure 5 shows the variation in frequency with respect to time with and without the proposed algorithm. Figure 6 shows the deviation in Hz with and without the proposed algorithm, remembering that the proposed algorithm try to find to minimize the df/dt of the system.

When comparing the results obtained in Figure 5, it shows that the low frequency improves after the application of the proposed method, going from a low frequency level of 1.16 % to 0.93 %; where the SEP remains in normal operating conditions within the range of ± 1 %.

1390-6542-enfoqueute-11-01-00096-i021.png

Figure 6

Deviation df/dt of the system

1390-6542-enfoqueute-11-01-00096-gf6.png

5. Conclusions and recommendations

The behavior of an electrical system is not a linear and stable process, which is why uncontrolled variations of parameters such as voltage and frequency at any point in the system can lead to critical stability behavior; activating security protocols and even affecting elements that depend directly on power such as transmission system cables by overloading them.

In this investigation, the response of the system referred to the change of generation given by the load has been tested and how the ROCOF relay action influences to prevent the system from straining its machines, minimizing the df / dt factor, leading to a lower frequency decrease of the system.

The ability of an electrical system to cope with disturbance states depends largely on the generation machines in their rolling reserve capacity, as well as on the control components that are available to reduce the impact of these disturbances on the system.

Although the analysis of energy not supplied has not been the subject of analysis, it must be taken into account in the procedures of electrical dispatch due to this being an economic technical characteristic of the electrical system.

Bibliography

1 

Aguila, A., Carrión, D., & Ortiz, L. (2015). Analysis of power losses in the asymmetric construction of electric distribution systems. IEEE,, 13, 2190-2194.

2 

Anderson, P. M., Fouad, A. A., & Happ, H. H. (1979). Power System Control and Stability. IEEE Transactions on Systems, Man, and Cybernetics, 9, 103-113, https://doi.org/10.1109/TSMC.1979.4310158.

3 

Arias, D., Vargas, L., & Rahmann, C. (2015). WAMS-Based Voltage Stability Indicator Considering Real Time Operation. IEEE. Transactions on Systems, 13, 1421-1428.

4 

Carrión, D., Ayo, A., Gonzalez, J. W., 2019, Under Frecuency Load Disconection Scheme Based on Improvement to Semi-Adaptative Model., INCISCOS.

5 

Carrión, D., Gonzalez, J. W., 2018, Optimal PMU Location in Electrical Power Systems Under N-1 Contingency., INCISCOS, https://doi.org/10.1109/INCISCOS.2018.00031.

6 

Carrión, D., & González, J. W. (2019). Ubicación óptima de PMU considerando restricciones de contingencias N-1 en sistemas eléctricos de potencia. Enfoque UTE, 10, 1-12, https://doi.org/10.29019/enfoqueute.v10n1.437.

7 

Carrión, D., González, J. W., Isaac, I. A., López, G. J., 2017, Optimal Fault Location in Transmission Lines Using Hybrid Method., IEEE. PES Innovative Smart Grid Technologies Conference,, https://doi.org/10.1109/ISGT-LA.2017.8126757.

8 

Carrión, D., Gonzalez, J. W., Isaac, I. A., López, G. J., Cardona, H. A, 2017, Load Characterization Based on Voltage and Current Phasorial Measurements in Micro-Grids., INCISCOS, https://doi.org/10.1109/INCISCOS.2017.23.

9 

Carrión, D., & Ortiz, L. (2013). Generación distribuida a partir de bicicletas estáticas y sistemas híbridos. Ingenius, 44-48.

10 

Correa, E., Inga, E., Inga, J., Hincapie, R., 2018, Electrical consumption pattern base on meter data management system using big data techniques., INCISCOS, https://doi.org/10.1109/INCISCOS.2017.19.

11 

Guerrón, G., García, E., & Montero, A. (2014). Influencia de las ráfagas de viento en la calidad de la energía de los parques eólicos ( Influence of wind gusts in power quality on wind farms ). Enfoque UTE,, 5, 25-44.

12 

Inga Ortega, E., Inga, J., Correa, E., & Hincapié, R. (2018). Reconstrucción del patrón de consumo eléctrico a partir de Big Data mediante técnica de MapReduce. Enfoque UTE,, 9, 177-187, https://doi.org/10.29019/enfoqueute.v9n1.220.

13 

Kundur, P. (1994). Power System Stability and Control. New York: McGraw-Hill Professional.

14 

Kupzog, F. (2008). Frequency-Responsive Load Management in Electric Power Grids. Südwestdeutscher Verlag für Hochschulschriften.

15 

Laghari, J. A., Mokhlis, H., Bakar, A., Halim, A. B., Karimi, M., Shahriari, A., 2012, An Intelligent Under Frequency Load Shedding Scheme for Islanded Distribution Network., Power Engineering and Optimization Conference (PEDCO), Melaka, Malaysia.

16 

Liu, B., Thomas, D., 2011, ROCOF protection in distributed system with noise and non-linear load. 2011 10th International Conference on Environment and Electrical Engineering, EEEIC.EU 2011 - Conference Proceedings, https://doi.org/10.1109/EEEIC.2011.5874715.

17 

Maldonado, M. G. R., 2017, Wireless Sensor Network for Smart Home Services Using Optimal Communications., INCISCOS, https://doi.org/10.1109/INCISCOS.2017.21.

18 

Massucco, S., Delfino, B., 2001, Implementation and Comparison of Different Under Frequency Load-Shedding Schemes., Power Engineering Society Summer Meeting.

19 

Mazaher, K., Hazlie, M., 2014, Under-Frequency Load Shedding Scheme for Islanded Distribution Network, 1st, LAP Lambert Academic Publishing.

20 

Perumal, I. N., Ying, C. C., 2004, A Proposed Strategy of Implementation for Load Shedding and Load Recovery with Dynamic Simulations., Power and Energy Conference.

21 

Ruiz, M., Masache, P., & Domínguez, J. (2018). High Availability Network for Critical Communications on Smart Grids. Ssn, 1-5.

22 

Ruiz Maldonado, M. G., & Inga, E. (2019). Asignación óptima de recursos de comunicaciones para sistemas de gestión de energía. Enfoque UTE, 10, 141-152, https://doi.org/10.29019/enfoqueute.v10n1.447.

23 

Schmitz, T. L., & Smith, K. S. (2009). Machining Dynamics: Frequency Response to Improved Productivity. New York: Springer.

24 

Shafiullah, M., Alsharif, B. S., Hossain, M. I., Ahsan, M. Q., 2014, Impact study on a load rich island and development of frequency based auto load shedding scheme to improve service reliability of the island., Informatics, Electronics & Vision (ICIEV).

25 

Shokooh, F., Dai, J. J., Shokooh, S., Tastet, J., Castro, H., Khandelwal, T., Donner, G., 2005, An Intelligent Load Shedding ( ILS ) System Application in a Large Industrial Facility. Industry Applications Conference, 2005., Fourtieth IAS Annual Meeting. Conference Record of the 2005,.

26 

Short, J. A., Infield, D. G., & Freris, L. L. (2007). Stabilization of Grid Frequency Through Dynamic Demand Control. Power Systems. IEEE, 22, 1284-1293.

27 

Systems, P., Committee, R., Power, I., & Society, E. (2007). IEEE Std C37.117TM-2007,. IEEE Guide for the Application of Protective Relays Used for Abnormal Frequency Load Shedding and Restoration:.

28 

Ten, C. F., Crossley, P. A., 2008, EVALUATION OF ROCOF RELAY PERFORMANCES ON NETWORKS WITH DISTRIBUTED GENERATION., Developments in Power System Protection. IET 9th International Conference On.

29 

Tofis, Y., Hadjidemetriou, L., & Kyriakides, E. (2013). An intelligent load shedding mechanism for maintaining frequency stability. PowerTech (POWERTECH), IEEE Grenoble.

30 

Zin, a. a. M., Hafiz, H. M., Wong, W. K., 2004, Static and dynamic under-frequency load shedding: A comparison, International Conference on Power System Technology, https://doi.org/10.1109/ICPST.2004.1460129.