Reduction of the Probability of Occurrence of Differential Pressure Sticking Through the Use of Diesel on Water Based Drilling Fluids
DOI:
https://doi.org/10.29019/enfoqueute.v10n1.366Keywords:
differential sticking, diesel, bow tie, riskAbstract
The drilling campaign on Pad C of the Tiputini Field, located on the Oriente Basin, Ecuador, started with the first exploratory well TPTC-002. Pressure tests performed on the M1 sandstone of the Napo Formation determined that the average reservoir pressure (Pr) was 1921 psi. Ten months later, Pr averaged 846 psi. This increased the risk of differential pressure sticking, event that indeed occurred while drilling the well TPTC-016. By using the “Bow-Tie” methodology as a predictive tool to analyze risks, and taking into account the preliminary studies that describe this phenomena, a solution was found for stablishing an additional barrier with the use of diesel on the water-based drilling fluid. Diesel was used in order to extend the ‘half value time’ and to decrease the friction coefficient between the mud cake and pipe.
Downloads
References
API RP 13B-1. (2009). Recommended Practice for Field Testing Water-based Drilling Fluids. 4th Edition. API.
De Dianous, V., y Fiévez, C. (2006). ARAMIS project: A more explicit demonstration of risk control through the use of bow–tie diagrams and the evaluation of safety barrier performance. Journal of Hazardous Materials, 130 (3), 220-233.
Ferguson, C. K., y Klotz, J. A. (1954, February 1). Filtration From Mud During Drilling. Society of Petroleum Engineers. doi:10.2118/289-G
Holt, C. A., y Falmy, H. (1997). The Successful Application of Diesel as Horizontal Drilling Fluid. Society of Petroleum Engineers. doi:10.2118/39283-MS
Khakzad, N., Khan, F., y Amyotte, P. (2012). Dynamic risk analysis using bow-tie approach. Reliability Engineering y System Safety, 104, 36-44.
Lewis, S., y Smith, K. (2010). Lessons learned from real world application of the bow-tie method. In Pre-pared for Presentation at American Institute of Chemical Engineers-6th Global Congress on Process Safety San Antonio.
Lledó, P., y Rivarola, G. (2007). Gestión de proyectos. Pearson Educación.
Outmans, H. D. (1958). Mechanics of Differential Pressure Sticking of Drill Collars. Society of Petroleum Engineers.
Petroamazonas EP, (2016a). Plan de Desarrollo Bloque 43-Ishpingo, Tiputini, Tambococha-ITT, unpublished, Petroamazonas EP, Ecuador.
Petroamazonas EP, (2016b). Presión de reservorio M1 en la plataforma Tiputini C [database], unpublished, Petroamazonas EP, Ecuador.
Petroamazonas EP, (2016c). Reporte final de Perforación- Pozo Tiputini C-016, unpublished, Petroamazonas EP, Ecuador.
Petroamazonas EP, (2016d). Programa de Perforación- Pozo Tiputini C-017, unpublished, Petroamazonas EP, Ecuador.
Petroamazonas EP, (2016e). Reporte final de Perforación- Pozo Tiputini C-018, unpublished, Petroamazonas EP, Ecuador.
Shahriar, A., Sadiq, R., y Tesfamariam, S. (2012). Risk analysis for oil & gas pipelines: A sustainability assessment approach using fuzzy based bow-tie analysis. Journal of Loss Prevention in the Process Industries, 25 (3), 505-523.
Published
Issue
Section
License
The authors retain all copyrights ©.
- The authors retain their trademark and patent rights, as well as rights to any process or procedure described in the article.
- The authors retain the right to share, copy, distribute, perform, and publicly communicate the article published in Enfoque UTE (for example, post it in an institutional repository or publish it in a book), provided that acknowledgment of its initial publication in Enfoque UTE is given.
- The authors retain the right to publish their work at a later date, to use the article or any part of it (for example, a compilation of their work, lecture notes, a thesis, or for a book), provided that they indicate the source of publication (authors of the work, journal, volume, issue, and date).